Method-Case Study: Design Build Contractor Selection

Category
Words
510 (1 page)
Downloads
98
Download for Free
Important: This sample is for inspiration and reference only

Introduction

Faisal Wisal is an owner of a firm who wants to get a commercial shopping complex build on their property, As the owner is not much familiar with construction Industry and don’t have much time to connect with different parties and get involved in conflicts, so he want to go for Design Build method of construction, discussions within the owner’s firm have come up with the requirements:

Loading…

A Shopping Complex Building

Approx. 10000 Sq. ft Area

Appropriate Parking Space

Building should comply with Ontario Building Code.

Serve up to 1000 people.

Air-conditioning and Heat Ventilation System.

Truck Loading and Unloading facilities.

In accordance with Zoning Regulations.

Introduction

Some Steps for Selection of a Design Builder

Search for some potential Design Build Companies available in the area.

Select most suitable companies on the basis of previous experience in similar projects and the budget of previous projects completed by them.

Send Request for Qualification to selected companies.

Based on the Qualification Criteria further mentioned filter the potential companies and send them Request for Proposal.

Loading…

Select the best Proposal according to your needs and Evaluation table criteria mentioned further.

Sign the contract with selected Proposal Company.

Pay some fees to the Companies asked for detailed proposal.

Some Steps for Selection of a Design Builder

Request for Qualifications

Based on the previous experience, rapport, financial stability and organisational structure, following 5 companies are selected to send the Request for Qualifications. Following these criteria the selected 5 companies were found to be qualifying and having advantage over other companies, so the Request for Qualification is being send to them. List is as follows:

ABC Design Builders

FKS Construction

Turnet Contractors

Afcon Builders

ZHC Design Contractors

Request for Qualifications

No time to compare samples?
Hire a Writer

✓Full confidentiality ✓No hidden charges ✓No plagiarism

Request For Proposal

Qualification based Selection is being used to send the Request for Proposal, following are the criteria on which the companies are being evaluated:

Reputation

Rapport

Technical competence

Commitment to the client’s interests

Familiarity with local geography and facilities

Experience and skills in project management

All the companies were evaluated on the criteria mentioned and following 3 companies are found to be meeting all requirements better than compared to others, So following companies are being sent the Request for Proposal.

ABC Design Builders

FKS Construction

Afcon Builders

Request For Proposal

RFP is sent to these companies, It consists of the following information:

Scope of Work

a)Proponent’s Design Team

b)Planning/Pre-design

c)Design Criteria

d)Material and Site Considerations

Preproposal Site Visit

Submission Conditions and Schedule

Request For Proposal

Loading…

Proposal Evaluation

Proposals are received from the companies and will be evaluated on the basis of criteria further mentioned in evaluation sheet and points will be awarded for each criteria and 1 proposer having maximum points will be considered best proposer and will be awarded the contract and other 2 proposer companies will be awarded some compensation for their Proposals.

Finally Based on Evaluation Criteria and Comparison FKS Construction scored highest points i.e. 362/390, so its being ranked 1 and selected as best proposer among 3 proposer companies.

So all the proposing companies are being notified about the selection of best proposer and their score based on evaluation criteria and the compensation will be provided to companies not selected for their proposal.

Proponent Selection

Awarding Contract

So the Contract is being negotiated and signed with FKS Construction for the Design and Construction of a Shopping Complex Building according to Design Build Method of Construction.

You can receive your plagiarism free paper on any topic in 3 hours!

*minimum deadline

Cite this Essay

To export a reference to this article please select a referencing style below

Copy to Clipboard
Method-Case Study: Design Build Contractor Selection. (2020, July 15). WritingBros. Retrieved May 11, 2024, from https://writingbros.com/essay-examples/method-case-study-design-build-contractor-selection/
“Method-Case Study: Design Build Contractor Selection.” WritingBros, 15 Jul. 2020, writingbros.com/essay-examples/method-case-study-design-build-contractor-selection/
Method-Case Study: Design Build Contractor Selection. [online]. Available at: <https://writingbros.com/essay-examples/method-case-study-design-build-contractor-selection/> [Accessed 11 May 2024].
Method-Case Study: Design Build Contractor Selection [Internet]. WritingBros. 2020 Jul 15 [cited 2024 May 11]. Available from: https://writingbros.com/essay-examples/method-case-study-design-build-contractor-selection/